FAILURE ARCHIVE

Everything that broke is part of the record.

These are public-safe research narratives, not claims that every corrected mechanism is proven generally.

From the original research notebook. Earlier concepts are preserved here as history. See the current theory map and dispositions →

01

The lease renewed—but authority still diverged

Original assumption
A live worker and periodic heartbeat were sufficient evidence of current authority.
Observed failure
A post-provider claim-set query failed at the fenced transition even after multiple renewals.
Corrected invariant
Every mutation must revalidate the exact job, owner, execution, claim set, catalog revisions, target, stage, and fence.
Remaining uncertainty
How portable is the complete binding across schedulers and stores?
02

Cleanup destroyed the only result

Original assumption
Removing credentials before destroying a disposable worker preserved enough evidence.
Observed failure
The provider-created commit existed only in the worker object database and was lost during correct cleanup.
Corrected invariant
Seal exact result objects and authenticated bindings durably before source destruction.
Remaining uncertainty
Which artifact format and byte ceiling generalize beyond Git?
03

A verification failure escaped the retry budget

Original assumption
Verification was downstream of provider retry policy and needed separate handling.
Observed failure
A production-like failure scheduled recovery outside the shared attempt limit.
Corrected invariant
Verification failures use the same bounded global and provider budgets as every other recovery path.
Remaining uncertainty
When does independent consultation add enough new information to justify its cost?
04

Current continuation authority is not source authority

Original assumption
A takeover could reuse an implementation execution’s old fence identity.
Observed failure
The live continuation and immutable source evidence required different bindings and failed closed.
Corrected invariant
Preserve immutable source identity while authorizing the current continuation with a new lease and fence.
Remaining uncertainty
What is the smallest portable capability model that expresses both?